Accepts: Mono-Si and Poly-Si crystalline panels, damaged or intact, with or without junction boxes.
Prohibited: Thin-film (CdTe/CIGS) modules, heavy stone contamination, hazardous battery cells.
Designed to exceed industrial safety, energy recuperation, and metallurgical purity requirements.
Continuous oxygen-free tunnel pyrolysis (550-650°C) with inert gas protection (O₂ ≤ 4%) fully gasifies EVA/POE polymers without silver oxidation.
Recovers intact, large-particle glass cullet and unbroken silicon wafers drastically reducing downstream sorting energy.
High-voltage electrostatic and air-density separator achieves high-purity multi-metal classification.
Closed-loop TO thermal incinerator (≥850°C / ≥2s) and 1s rapid quench tower completely eliminate secondary emissions.
Fully modular skid configuration allowing rapid on-site commissioning within 15 days.
| Parameter Item / Specification | Engineering Standard / Technical Value |
|---|---|
| Target Feedstock | End-of-Life Crystalline Silicon (c-Si) Single/Double Glass PV Modules (Width: 800-1,300 mm) |
| Processing Throughput | 1,000 - 3,000 kg/h (customizable up to 5,000 kg/h) |
| Clean Glass Yield | ≥ 95% - 98% (EVA/POE residue-free cullet, Purity ≥ 98%) |
| Aluminum Frame Recovery | ≥ 99% pure 6063 alloy profiles |
| Copper Ribbon Recovery | 95% - 98% (Purity ≥ 98% clean metallic copper fraction) |
| Silicon Wafer Recovery | ≥ 95% - 98% (Purity ≥ 98% industrial silicon precursor) |
| Silver (Ag) Recovery | ≥ 95% precious refined silver fraction |
| Pyrolysis Working Temp | 550 - 650°C (Inert atmosphere O₂ ≤ 4%) |
| Installed Power | 180 - 320 kW (380V / 50-60Hz / 3-Phase) |
| Automation System | Siemens S7-1500 PLC + Industrial SCADA Touch Console |
| Footprint Requirement | 1,200 - 2,500 m² (Ceiling height ≥ 7.0m) |
| Environmental Standard | Negative pressure operation, Dioxin < 0.1 ng-TEQ/m³ |
From raw material pilot trials at our Zhengzhou testing base to ocean shipping, civil foundation guidance, on-site mechanical erection, and environmental acceptance.
Send sample feedstock for pilot test runs and ICP elemental analysis.
Complete plant layout, loading docks, power distribution, and foundation design.
Continuous running tests, pressure testing, and dynamic balancing before shipment.
Senior engineers dispatched for mechanical assembly, DCS tuning, and operator training.
Continuous rotary th...
Specialized continuo...
Continuous rotary th...
Technical specifications, structural chemistry, thermal kinetics, and operational principles for continuous oxygen-free tunnel pyrolysis recycling of decommissioned solar panels.