Project Location:
Brandenburg, Germany
Annual Processing Capacity:
20,000 Metric Tons / Year
Operating Throughput:
5,000 kg/h (Continuous 24/7)
Target Feedstock:
End-of-Life c-Si Single-Glass & Bifacial Double-Glass Modules
Recovered Clean Glass:
≥ 98.4% purity, suitable for float glass remelting
Silver (Ag) Recovery Purity:
99.2% industrial electrolytic grade
Copper Fraction:
≥ 94% pure conductive ribbon granulates
Aluminum Frame Recovery:
100% clean 6063 alloy profiles
Automation Level:
Fully integrated Siemens S7-1500 DCS with SCADA telemetry
Environmental Standard:
EU WEEE Directive, TA-Luft 2021, Dioxin < 0.05 ng-TEQ/m³
Commissioning Duration:
28 Days from mechanical positioning to acceptance
Feedstock & Product Outputs:
Accepts: Crystalline silicon mono/polycrystalline PV panels, unbroken or shattered.
Output Products: High-purity glass flakes, copper granules, crude silicon, and 99.2% silver precipitate.