Henan Industrial Equipment Cluster, China
Certifications: ISO9001 / CE / EPA Compliant
24/7 Global Response
Germany / Central Europe • Regional Renewable Energy & Metallurgical Recycler

20,000 Tons/Year Solar Panel Continuous Pyrolysis Project in Germany

Commercial decommissioned PV panel recycling plant operating in compliance with EU WEEE Directive and German TA-Luft emission limits.

20,000 Tons/Year Solar Panel Continuous Pyrolysis Project in Germany
ENV-PV-TK5000 Turnkey Installation
Delivered, Commissioned & Environmental Tested by Henan Yushunxin (ENV)
Request Similar Case ROI

Project Implementation & Operational Delivery

In response to the surge of first-generation photovoltaic power station decommissioning in Central Europe, Henan Yushunxin Heavy Industry Technology (ENV) engineered, manufactured, and commissioned a turnkey continuous tunnel furnace pyrolysis recycling plant for a leading German metallurgical recovery group.

The facility treats 20,000 metric tons of crystalline silicon modules annually (approx. 5,000 kg/h). The integrated automated production line includes high-speed hydraulic 4-sided frame stripping, pneumatic junction box cutters, continuous multi-zone oxygen-free tunnel pyrolysis, fine milling, and high-voltage corona electrostatic sorting.

All vaporized organic compounds from EVA/POE polymers are incinerated in a secondary thermal oxidizer (>850°C, 2.0s residence time) and rapidly quenched below 200°C to guarantee zero dioxin reformation, fully satisfying the stringent German TA-Luft environmental standards.

Key Engineering & Commissioning Highlights:

  • ✓ Multi-zone indirect tunnel kiln allows precise temperature curve matching different EVA/POE polymers.
  • ✓ Self-sustaining thermal oxidizer recycles syngas, cutting external natural gas heating demand by 65%.
  • ✓ Inline laser optical sensors and infrared thermal cameras provide continuous furnace atmosphere monitoring.
  • ✓ Zero wet chemical leaching: 100% dry physical sorting avoids toxic wastewater generation.
  • ✓ German TÜV certified safety interlocks and automated nitrogen purge emergency shutoff systems.

Verified Project Parameters Accepted

Project Location: Brandenburg, Germany
Annual Processing Capacity: 20,000 Metric Tons / Year
Operating Throughput: 5,000 kg/h (Continuous 24/7)
Target Feedstock: End-of-Life c-Si Single-Glass & Bifacial Double-Glass Modules
Recovered Clean Glass: ≥ 98.4% purity, suitable for float glass remelting
Silver (Ag) Recovery Purity: 99.2% industrial electrolytic grade
Copper Fraction: ≥ 94% pure conductive ribbon granulates
Aluminum Frame Recovery: 100% clean 6063 alloy profiles
Automation Level: Fully integrated Siemens S7-1500 DCS with SCADA telemetry
Environmental Standard: EU WEEE Directive, TA-Luft 2021, Dioxin < 0.05 ng-TEQ/m³
Commissioning Duration: 28 Days from mechanical positioning to acceptance
Feedstock & Product Outputs:

Accepts: Crystalline silicon mono/polycrystalline PV panels, unbroken or shattered.
Output Products: High-purity glass flakes, copper granules, crude silicon, and 99.2% silver precipitate.

More Reference Projects

View All Cases →